Pelco PP4348 Nail Gun User Manual


 
C204M-A (11/99)
PP4348
Rooftop Parapet Adapter Mount
®
IMPORTANT SAFEGUARDS AND WARNINGS
Prior to installation and use of this product, the following WARNINGS should be observed.
1. Installation and servicing should only be done by qualified service personnel and conform
to all local codes.
2. Only use replacement parts recommended by Pelco.
3. Use only installation methods and materials capable of supporting four times the maxi-
mum specified load.
4. Use stainless steel hardware to fasten the mount to outdoor surfaces.
5. To prevent damage from water leakage when installing a mount outdoors on a roof or
wall, apply sealant around the bolt holes between the mount and mounting surface.
Please thoroughly familiarize yourself with the information in this manual prior to installa-
tion and operation.
DESCRIPTION
The PP4348 is a rooftop parapet mount designed for use with Legacy ® Series pan/tilts and
enclosures. The PP4348 can also be used with the IWM Series Wall Mount and IDM4018 Wall
Mount for pendant domes. The PP4348 mounts directly on a flat roof or smooth horizontal
surface and supports up to 75 pounds (34 kg).
INSTALLATION
1. Determine the mounting location. Use the base of the mount as a template and mark the
bolt hole positions on the mounting surface.
2. Set the base plate to the side and prepare the bolt holes for the fasteners.
3. Reposition the base of the PP4348
and secure with a minimum of eight
fasteners. To prevent water damage,
seal the bolt holes with appropriate
sealant. Apply sealant between the
mount and the mounting surface.
4. Route the wiring and cabling into the
feedthrough hole in the base of the
PP4348. Refer to Figure 1.
5. Guide the wiring and cabling through
the bottom of the pole assembly and
out the feedthrough hole at the top
of the pole assembly. Insert the pole
assembly into the base. Install but
do not tighten the two 1/4-20 bolts to
secure the pole assembly.
6. Attach the mount arm to the PP4348
with the four sets of flat washers,
lock washers, and nuts that are sup-
plied. Refer to the instruction
manual supplied with the mount arm.
7. After ensuring the system is com-
pletely operational, rotate the upper
assembly into position and tighten
the two 1/4-20 bolts to secure the
pole assembly.
Figure 1. PP4348 Exploded View
POLE ASSEMBLY
(PP43001008WA)
BASE
(PP43001009WA)
THREADED FOR
1/4-20 BOLTS
FEEDTHROUGH
HOLE
FEEDTHROUGH
HOLE
3500 Pelco Way,
Clovis, CA 93612-5699
USA
In North America & Canada:
Tel (800) 289-9100
FAX (800) 289-9150
International Customers:
Tel +1 (559) 292-1981
FAX +1 (559) 348-1120
www.pelco.com