Acu-Rite 06008RM/3N1TXC Stud Sensor User Manual


 
5
3-in-1 Sensor Installation Guidelines
INSTALLATION HEIGHT Mount the sensor at least 5 feet (1.5 meters) off the ground
(higher is better for wind measurement) in an open area. Secure to fence post, 2”x4”
wood, 3/4” pole, etc. (not included)
LEVEL INSTALLATION Use a bubble level (not included) to ensure level installation for
accurate wind measurement.
Top or Side Mount
1. Insert the mounting base into the
hole on the bottom of the sensor.
2. Use one of the screws included
in the hardware bag to fasten
the lower sensor housing to the
mounting base.
3. Fasten mounting base to a post or
railing using 2 screws.
Pole Mount
1. Insert pole (we recommend 3/4” schedule
40 PVC / 25.8 mm O.D., not included)
or similar item all the way into the hole on
the bottom of the sensor. Note: Mounting
base is not used.
2. Use one of the screws included in the
hardware bag to fasten the lower sensor
housing securely to the pole.
The 3-in-1 sensor is now ready to use.
Clear Data Collected During Installation
When installation is complete, clear erroneous data from companion unit (not
included). Please refer to the companion unit's instructions for details.
Basic Setup is Complete
The 3-in-1 sensor will now synchronize. It may take a few minutes for synchronization
to complete.
Top Mount Side Mount
Pole Mount
Do not install during
electrical storms.
Do not place pole
or sensor near
electrical lines or
electrical equipment.