12
Getting Started With Your System
Cabling Your Expansion Enclosure
Turning On the Storage Array
Turn on the components in the following order:
1
FC switches (if used)
2
MD1200 series expansion enclosures (if used)
NOTE:
Before turning on the storage array, ensure that the expansion
enclosure status LED is blue.
PowerVault MD3600f
series storage array
PowerVault MD1200
series expansion
enclosure 1 (optional)
PowerVault MD1200
series expansion
enclosure 2 (optional)