-16-
G0445/G0582/G9962Z/9962ZX Wide Belt Sander
To install the air line:
1. Connect the hose from your air compressor
to the air inlet (
Figure 9) on the regulator.
Air Inlet
Air ON/OFF
Lever
(Open Position)
Regulator
Knob
2. Move the red handle on the regulator to the
open position (parallel with the air inlet).
3. Lift the regulator knob (Figures 9 and 11)
and turn it until the air pressure gauge reads
75 PSI.
Note: Turn the knob clockwise to
increase the air pressure and counterclock
-
wise to lower the air pressure.
4. Push the regulator knob down until it snaps.
Beginning Assembly
Your safety is important! Complete the assem-
bly in the order provided in this manual. Then
read the rest of the manual before attempting any
type of sanding operation.
Disconnect power to the
machine for the assem
-
bly process. Failure to
do this may result in
serious personal injury.
Figure 9. Air inlet located on regulator.
Air Line Installation
SECTION 3: SETUP
Unpacking
The Model G0445/G0582/G9962Z/G9962ZX
was carefully packed when it left our warehouse.
If you discover the machine is damaged after you
have signed for delivery, please immediately call
Customer Service at (570) 546-9663
for advice.
Save the containers and all packing materials for
possible inspection by the carrier or its agent.
Otherwise, filing a freight claim can be difficult.
When you are completely satisfied with the con
-
dition of your shipment, you should inventory the
contents.
Wide belt sanders are
heavy machines often
weighing approximately
one ton. Personal injury
can occur if the machine
is moved without appro-
priate machinery. Use a
crane or forklift when
moving or lifting the
machine.
NOTICE
A parts diagram and parts list are located
near the end of the manual. Use the diagram
and list to identify missing parts or to sup
-
plement the assembly instructions provided
in this manual.