Installation
311051D 11
Install Air Fittings
1. Install the supplied 1/4 in. tube fitting into the cylin-
der (CYL) air port.
2. Install 3/8 in. tube fittings into the atomization
(ATOM) air port and the fan (FAN) air port.
Ground System
The following grounding instructions are minimum
requirements for a system. Your system may include
other equipment or objects that must be grounded.
Check your local electrical code for detailed grounding
instructions for your area and type of equipment. Your
system must be connected to a true earth ground.
Ground Pump/Fluid Supply
Ground the pump by connecting a ground wire and
clamp between the fluid supply and a true earth ground
as instructed in your separate pump instruction manual.
Ground Air Compressors and Hydraulic
Power Supplies
Ground the air compressors and hydraulic power sup-
plies according to the manufacturer recommendations.
Ground Spray Gun
Ground the spray gun by mounting the manifold to a
properly grounded reciprocator, robot, or stationary
mount. Check the electrical resistance between the
manifold and a true earth ground. The resistance must
be less than 1 megohm.
Ground Fluid Supply Container
Ground the fluid supply container according to local
code.
Ground Object Being Sprayed
Ground the object that is being sprayed according to
local code.
Ground Solvent Pails
Ground all solvent pails that are used when flushing
according to local code. Use only metal pails, which are
conductive. Do not place the pail on a non-conductive
surface, such as paper or cardboard, which interrupts
the grounding continuity.
F
IG. 4: Air Fittings
CYL
ATOM
FAN
TI8211a