̅ Only place the planer against the workpiece after switching it on.
̅ The base plate ¾ must always lay flat on the workpiece when working.
̅ Do not clear dust etc. from the dust outlet · with your fingers. Use a piece of wood to dislodge any trapped planing debris.
OPERATION
The PEH 900 power planer has INTELLIGENT POWER CONTROL. This electronic management system
monitors and controls your power planer in its various operating states;
Operating state Feature
Switching On/Off: The IPC electronic system start-up mode ensures that the motor starts up slowly and gently. This large
ly avoids heavy transient current surges, and means that electrical safety cut-out devices are not
generally tripped (building sites, domestic premises).
No-load running: After switching on, the IPC electronic management system run-up mode takes the planer speed up to
the pre-set required value. After this is reached, the IPC system speed control mode keeps the grinder
operating at a constant speed.
WARNING:
Always remove the plug from the mains socket before working on the planer.
Take note of the mains voltage. The voltage must agree with that shown on the rating plate (equipment shown as 230 V can also be
used with 220 V).
ON / OFF SWITCH
On the grounds of safety the ON / OFF switch ¿ cannot be locked in the ON position for continuous operation. It must always be pressed
during operation.
SETTING THE PLANING DEPTH
The planing depth can be set between 0 - 3.5 mm. Turn the guide handle/ planing depth adjuster ³ and set the pointer to the desired
mark or value.
DUST REMOVAL AND VACUUM EXTRACTION
The dust outlet · can simply be switched to the right or left by fitting the cap over the appropriate opening.
ƽ
ƽ
9
╞