Lightolier 6450 Work Light User Manual


 
Job Information Type:
631 Airport Road, Fall River, MA 02720 • (508) 679-8131 • Fax (508) 674-4710
We reserve the right to change details of design, materials and finish.
www.lightolier.com © 2008 Philips Group • C0908
Lytespan
®
Track Lighting System 6450
Page 3 of 4 Suspension Beam System
CABLE OR STEM
Stems are recommended for housings in straight runs or patterns and cables for
housings in patterns only. Both attach to the housings at any point (except at top
wireway covers), may be spaced up to 8' apart and may be shortened in the
field. The cables have an adjusting collar to facilitate leveling. Stem length may
be increased 48" with the Stem Extension Kit. A special coupler is included to
strengthen the joint between housings.
POWER FEED AND POWER CONTINUITY
Power is fed into the end of a straight run of housings with a Stem Kit. Power is fed into a pattern of housings
at the Housing Splice Boxes with a Stem Kit or a Cable Kit with electrical feed. Power is also continued from
one track run to another through the Housing/Splice Boxes. Auxiliary Electrical Connectors, which are ordered
in sets with Housing/Splice Boxes, are required for power feed or power continuity at Housing/Splice Boxes.
3" OR 4" OCTAGONAL
OUTLET (by others)
LEADS (by others)
Continued from page 2.
COMPONENTS
STEM EXTENSION KIT