NCR 7455 Work Light User Manual


 
Site Preparation
Introduction
18427
1
2
3
4
5
6
7
8
9
0
This document provides the information necessary to prepare a site to
NCR specifications prior to installing a terminal. The site must be
properly prepared before the retail terminal is installed because site
preparation deficiencies may be difficult to detect and correct after
installation.
The terminal consists of separate pieces that may be combined in a
variety of configurations. Certain combinations are mutually exclusive.
You must determine the equipment that will actually be installed
before proceeding with the site preparation.