A SERVICE OF

logo

115 VOLT
1 PHASE
1 1/2 NPT
3/4 NPT
UNIT SUPPORT
BY OTHERS
MANUAL DRAIN VALVE
BY OTHERS
ROOF LINE
TO DRAIN BY OTHERS
WATER VALVE BY OTHERS
FRESH WATER
SUPPLY
WATER
LEVEL
RESERVOIR
BLEED OFF
VALVE
FLOAT VALVE
1/2 NPT
OVER FLOW
OF
DR
DV
WV
WP
FV
TO NEUTRAL
PUMP MOTOR
CONTROL RELAY
GRN
WHT
PUMP MOTOR
RED
RED
PUMP MOTOR
CONTROL RELAY
CONTACTS
TO CONTROL CONTACTS
BLU
FL
- 4 -
NEEDS LEGEND
__ __ __ __ __ Field Wired
____________ Factory Wired
__ _______ __ Field Piping
the electrical wiring with all applicable local, state, or provincial and national ordinances and codes.
Water connections (refer to "Specifications') should, and must follow, local codes and ordinances. Connections are provided 
on each unit with standard pipe thread sizes. Refer to pages 4 and 5 for your system. For units with automatic drain kit and 
freeze protection, the minimum pressure should be 10 PSI so valves will operate properly; for other models, 10 PSI or less.
Set the float valve (FV) to allow fresh water to enter reservoir to a depth of 2 1/2" for models EC-40 through EC-750. By 
loosening the thumb screw, located on the float valve assembly, and setting the float until the valve shut off is at the de- 
signed depth, no other adjustment needs to be made. Do not forget to tighten the thumb screw securely.
You may now start your unit. Watch for the first few times that the media gets completely saturated and that all phases of 
operations (See "Operations") are working properly. If necessary adjust the pump discharge gate valve to avoid dry areas 
on the media. Water should be visible trickling down the flutes of the media. Watch also for excess foaming (See 
"Trouble Shooting") of the water and media.
After a day of operation you will notice the water to be a shade of green. The media is the cause, and the reservoir 
should be drained and refilled a couple of times to correct this.
Now proceed to the "Operation" part of this manual and read about the unit that you have purchased.
3.
4.
5.
6.
CAUTION:
must comply
OPERATION
Refer to the schematic piping and wiring while going through start-up procedure for the particular system you have purchased.
STANDARD UNIT START UP PROCEDURE
1.
2.
3.
4.
5.
6.
OPEN MANUAL SHUT OFF VALVE (WV).
MANUAL DRAIN VALVE (DV) IS CLOSED.
FLOAT VALVE (FV) ALLOWS FRESH WATER TO ENTER 
RESERVOIR.
WATER PUMP (WP) WILL START AS SOON AS FLOAT 
SWITCH (FL) CLOSES. iF WATER IS TOO LOW PUMP 
WON'T RUN. WATER PUMP (WP) SHOULD BE WIRED SO 
THAT PUMP CANNOT RUN WITHOUT BLOWER MOTOR IN 
OPERATION.
BLEED OFF (BO) TO PREVENT SCALE FORMATION. A 
BLEED-OFF AT THE RATE OF 3-6% IS REQUIRED. THE 
EXACT AMOUNT WILL DEPEND ON THE pH AND 
HARDNESS OF THE WATER, AND THE INTENSITY OF 
EVAPORATION.
UNIT CAN BE USED WITH BLOWER ON, AND 
EVAPORATIVE COOLER PUMP OFF.