A SERVICE OF

logo

CUBELET CUTTER GRIDS
i-
9.l/2”-1
h CUBE CUTTER GRID
1%” x 1X” Cube Grid
CHECK OPERATION
v
Start the unit by turning the service switch to
“ON” and opening the line water valve.
If
NOTE: Left is “OFF” - Middle is “ON” - Right
is “CLEAN.” In “CLEAN” position, only the
pump operates.
If
Check condenser fan to make sure it is revolving.
v
Water will not enter pump pan until freezing
plate gets cold and machine goes into a harvest
cycle.
v
Check for even water flow over freezrng plate.
Unit must be level for proper operation.
v
Check for desired cube thtckness and after 24
hours adjust if necessary. Maximum ice yield
will be obtained with Ice thickness at
‘/2”
to 3%“.
v
Replace grill.
Part No. 758842-U
Printed in U.S.A.