![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/c/aa/caa2d096-b264-4060-ae57-bd5b06e44149/caa2d096-b264-4060-ae57-bd5b06e44149-bg6.png)
1007076 Rev. A
6
3a.AssembleTieBars(5)toFrameAngles(4)
using1/2"x1-1/2"Bolts(10),1/2"Lockwashers
(19),and1/2"Nuts(15).
3b.AssembleTieBars(5)toPullBar(3)using
1/2"x2"Bolt(11),1/2"Lockwasher(19),and1/2"
Nut(15).
3c.TightenhardwarefromStep2a.
4a.AssembleSpringShanks(6)toFrame
Angles(4)using1/2"x1-1/2"Bolts(10),Special
Spacers(21),1/2"Lockwashers(19),and1/2"
Nuts(15).
EnsureSpringShanksaresettorunstraightin
thedirectionoftravel.
4b.Whenassemblingforin-betweenrow
cultivation,theextraSpringShankwillbe
mountedinthecenterofthecultivator,using
thesameholeandhardwareusedtofastenTie
Bars(5)toPullBar(3),referencelocation(A)in
illustration.
Figure 3
Figure 4
FRAME TIE BAR ASSEMBLY
SPRING SHANK ASSEMBLY
ASSEMBLY
(10)
Bolt,1/2"x1-1/2"
Qty.2
(10)
Bolt,1/2"x1-1/2"
Qty.6
(11)
Bolt,1/2"x2"
Qty.1
(19)
Lockwasher,1/2"
Qty.3
(19)
Lockwasher,1/2"
Qty.6
(15)
Nut,1/2"
Qty.3
(15)
Nut,1/2"
Qty.6
(21)
SpecialSpacer
Qty.6(or7)