Dell SC100 Tool Storage User Manual


 
Before You Begin
Consider the following best practices before setting up your SC100/SC120 expansion enclosure.
Before connecting any cables between the storage system and expansion enclosure, physically label
each port and connector.
Always follow proper power-up and power-down procedures when cycling power across the
network. Verify that critical network components are on separate power circuits.
NOTE: This product is intended for restricted access locations, such as a dedicated equipment
room or equipment closet.
WARNING: If installed in a closed or multi-unit rack assembly, the operating ambient
temperature of the rack environment may be greater than room ambient temperature. Therefore,
consideration should be given to installing the equipment in an environment compatible with the
maximum ambient temperature (Tma) specified by the manufacturer.
Other Information You May Need
Additional information you may need to install the expansion enclosure.
NOTE: See the safety and regulatory information that shipped with your Storage Center
components. Warranty information is included as a separate document.
The Dell Storage Center SCv2000/SCv2020 Storage System Deployment Guide provides information
about cabling Storage Center hardware components and configuring a new Storage Center using the
Dell Storage Client.
The Dell Storage Center Dell Storage Client Administrator’s Guide describes how to use the Dell
Storage Client to manage a Storage Center.
Installation and Configuration
Before you begin the installation, make sure that the site where you plan to install the expansion
enclosure
has standard power from an independent source or a rack power distribution unit with a UPS.
Unpacking Storage Center Equipment
Unpack the expansion enclosure and identify the items in your shipment.
3