12
ASSEMBLING RIP FENCE
1. Thread an M8 hex nut (A) Fig. 22, approximately
halfway onto stud of handle (B).
2. Thread handle (B) Fig. 22, into tapped hole (C) in fence
cam (D). Tighten hex nut (A) Fig. 23, against cam (D).
3. Lower rip fence onto table as shown in Fig. 24,
making certain rear clamp (E) Fig. 22, hooks over back
edge of table.
4. The rip fence is usually operated on the right hand
side of the saw table. Lift lock handle (B) Fig. 24, and
position fence on table as shown. Push downward on
handle (B) Fig. 24, to lock fence in place on saw table.
MITER GAGE
The miter gage is shipped completely assembled and is
supplied with a T-slot miter gage bar (A) Fig. 25, that is
inserted into either one of the two T-slotted miter gage
grooves located in the table top, as shown. The T-slot
miter gage prevents the miter gage from falling when it
is extended out beyond the front of the table when
cross-cutting extra wide workpieces.
Fig. 22
Fig. 23
Fig. 24
Fig. 25
E
B
A
C
D
A
D
B
A