Control Board Replacement
311911C 21
Installation
1. Position grommet and power cord wires through
strain relief in control board (33).
2. Connect the power cord connectors to the correct
terminals indicated on the control board (120V,
black and white, 240V, blue and brown) on control
board (33).
3. Carefully slide control board back into place on the
side of the motor frame.
4. Install three screws (30). Torque to 30-35 in-lb
(3.4-3.9 N.m).
5. Attach motor connector (B) and pressure control
assembly connector (A).
6. Install shroud (29) and two screws (30) (see illustra-
tion, page 16).
ti6122a
33
Grommet
Strain
Relief
120V
240V
ti6143b
33
33
C
C
30
33
ti9258a
120V
240V
ti6143b
33
33
A
B
B
A