Heath Zenith 598-1283-00 Work Light User Manual


 
5
598-1283-00
O
F
F
3
6
D
U
S
K
T
O
D
A
W
N
TESTING
Turn on the circuit breaker and light
switch.
Avoid aiming the control at:
• Objects that change temperature rapidly,
such as heating vents and air condition-
ers. These heat sources could cause false
triggering.
• Areas where pets or traffic may trigger
the control.
Nearby large, light-colored objects re-
flecting light may trigger the shut-off feature.
Do not point other lights at the sensor.
NOTE: Sensor has a 1
1
/
2
minute warm up
period before it will detect motion.
When first turned on or when
switching modes wait 1
1
/
2
minutes.
TEST 1 5 10 MIN
ON-TIME
OFF 3 6 DUSK TO
HOUR
DAWN
Caulk fixture mounting surface with
silicone weather sealant. You may want
to wait until you have completed the tests
and adjustments on pages 4 and 5.
❒ Install one 100 Watt max. light bulb.
Slide the fixture onto the mounting
screws and tighten nuts.
Controls facing
downward
COMPLETE THE
INSTALLATION
Stuff the wires into the junction box.
Make sure the wires from the fixture go
through the wire path, and no wires get
pinched.
Switch the on-time to TEST position and
DualBrite
®
switch to the off position.