Heath Zenith SH-9250-WH Work Light User Manual


 
-4-
598-1341-00
Package Contents
Motion Sensor Light Fixture
Manual
Hardware Pack
1 Gasket
1 Hanger
1 Crossbar Mounting Bracket
4 Wire nuts
2 #6-32 X 3/4" Screws
(for small rectangular boxes)
2 #8-32 X 3/8" Screws
(for circular or octagon boxes)
2 #10-24 X 1/2" Screws
(for water tight boxes)
1 M5 X 0.8 X 40 mm Screw
(fixture to mounting bracket)
1 Rubber Plug
Estimated Installation Time: 30 minutes
Items needed for installation (not included):
Phillips and flathead screwdrivers
Pliers
Wire strippers/cutters
Ladder
2 Flood lamps, 150 Watts Maximum per lamp
Safety glasses
Silicone caulk
Fits All Junction Box Configurations
Circular
Horizontal rectangular
Vertical rectangular
Octagon