Miller Electric I-22A & I-24A Welder User Manual


 
OM-186 895 Page 14
3-8. Optional Meter Circuit Board Settings
801 925-C / Ref. 186 266
Tools Needed:
1/4 in
1 Meter Circuit Board
2 DIP Switch S2
3 Potentiometer R18
4 Receptacle RC16
Wiring harness with free-hanging
plug PLG42 connects to RC16.
For voltage feedback from voltage
sensing lead, connect plug PLG43
from unit wiring harness to PLG42.
For voltage feedback from welding
power source to wire feeder 14-pin
receptacle, connect plug PLG41
from unit wiring harness to PLG42.
12345
12345
12345
12345
Or
Or
Meters/Minute
Inches/Minute
Digital Meter Display
Arc Voltage Sensing Using Voltage Sensing
Lead For Welding Power Source That Does
Not Support Pins F And H
Voltage Sensing Function
Arc Voltage Sensing Using Feedback From
Welding Power Source That Does Support
Pins F And H
12
X Means switch position does not affect
specified function.
.
Means switch must be in this position.
2
1