Miller Electric XMT 304 CC/CV Welder User Manual


 
OM-233 045 Page 21
4-9. Connecting 3-Phase Input Power
2/04 - Ref. 802 136-A / 801 192
! Installation must meet all National
and Local Codes have only quali-
fied persons make this installation.
! Disconnect and lockout/tagout in-
put power before connecting input
conductors from unit.
! Always connect green or green/
yellow conductor to supply
grounding terminal first, and never
to a line terminal.
For Three-Phase Operation
1 Input Power Cord.
2 Disconnect Device (switch shown in
the OFF position)
3 Green Or Green/Yellow Grounding
Conductor
4 Disconnect Device Grounding
Terminal
5 Input Conductors (L1, L2 And L3)
6 Disconnect Device Line Terminals
Connect green or green/yellow grounding
conductor to disconnect device grounding
terminal first.
Connect input conductors L1, L2, and L3
to disconnect device line terminals.
7 Overcurrent Protection
Select type and size of overcurrent protec-
tion using Section 4-8 (fused disconnect
switch shown).
Close and secure door on disconnect
device. Remove lockout/tagout device,
and place switch in the On position.
= GND/PE Earth Ground
L1
2
1
L2
L3
3
3
4
5
6
7
Tools Needed: