Porter-Cable A15149 Router User Manual


 
13
TEMPLET GUIDES
A wide variety of templet guides is available for use in pattern and templet
routing operations. Fig. 7 shows a typical combination bit, templet guide, and
locknut.
DISCONNECT TOOL FROM POWER SOURCE.
To install, insert templet guide in center hole of router base and secure in place
with the locknut.
BEFORE CONNECTING TOOL TO POWER SOURCE, install the bit, adjust the
depth of cut, and rotate the router chuck by hand. Make sure that the bit or
collet do not contact templet guide.
Fig. 6
Fig. 7
ROUTER
BASE
SUB-BASE
TEMPLET GUIDE
ROUTER BIT
LOCKNUT
B
B
C
D
A
For assistance with your tool, visit our website at www.porter
-cable.com
for a
list of service centers or call the Porter-Cable help line at 1-800-487-8665.
TROUBLESHOOTING