A SERVICE OF

logo

3 - 8 ONline Ethernet 10BASE-FL Installation and Operation Guide
Table 3-4 lists the functions and settings for switches 5 and 6. For a
definition of each dip switch function, refer to the Configuring the Module
section in this chapter.
Installing the Module
You do not need to power down the ONline System Concentrator to install
the 10BASE-FL Module. You can insert the module while the concentrator is
operating (this is called a hot swap).
To install the module:
1. Do one of the following:
If you do not have a management module installed in the
concentrator, set the dip switches on the board (if different from
the default settings). After you complete the installation
procedure, proceed to the Monitoring the Front Panel section to
verify the installation.
If you have a management module installed in the concentrator,
complete this installation procedure and then configure the
module using the commands as described in the Configuring the
Module section.
Table 3-4. Dip Switch SW2 Settings for Switches 5 and 6
CHA CHB Channel Selection
Switch Settings
On On 1 (factory default)
On Off 2
Off On 3
Off Off Isolated (module operates
independent of any backplane
channel)