A SERVICE OF

logo

13
39.1 Ensure the Backboard faces the playing surface and align the small hole in the Middle Pole (MP) with the correct slot in the Bottom Pole (BP).
Slide the Middle Pole over the Bottom Pole.
39
39.3 Place the Wood Block (AJ) on top of the pole and strike with a hammer six or
seven times.
**AT LEAST 2 ADULTS REQUIRED FOR THIS STEP**
AJ
TP
MP
BP
39.5 After setting the poles in step 39.3, Insert
the Pole Cap (AW) into the pole.
Note: To ensure that the concrete can fully set, do
not play aggressively on your basketball system
for a week.
BP
MP
PA
39.2 Insert the remaining 1/4” x 3/4” Screw (PA) through the small hole in the Middle Pole and into the Bottom Pole. The Screw will spin
freely once installed.
Warning: If the Middle Pole does not completely cover the slot on the Bottom Pole after seating, DO NOT COMPLETE ASSEMBLY. Call our Customer
Service Department.
AW
Screwdriver
1005748
Required For This Page:
PA
(1)
Hammer/Mallet
TP
39.4 Place a Self-tapping Screw (PB) directly into the
chuck of the Electric Drill and insert the screw into the
back of the poles at the locations shown.
Note: There are two screw holes at the bottom of the pole. The correct hole will be slightly larger and slightly higher up on the pole.
(2)
PB
PB
PB
Use extreme caution when standing on ladders to
perform assembly steps. Follow all warnings and
cautions on the ladder. Failure to follow all of these
instructions and warnings could lead to serious
personal injury or property damage.
WARNING
PB
Electric Drill