3Com Switch 4500 PWR 50-Port Work Light User Manual


 
36 CHAPTER 2: INSTALLING THE SWITCH
Packing and
Shipping the Switch
4500
This section describes how to correctly package your Switch 4500 should
you need to return the Switch to 3Com.
WARNING: The unit should be packaged safely to ensure that you do
not invalidate the repair.
Follow these steps to ensure that you package your unit correctly:
1 Orientate your Switch so that the back panel is on the left side (looking
down at the top of the unit) as shown in
Figure 9.
2 Secure one of the polystyrene supports to the back panel side of the unit.
Secure the other support to the front panel side of the unit.
3 Place the unit in the box with the back panel next to the cable packaging.
Figure 9 Correct Orientation When Packing the Switch 4500
Polystyrene Supports
3Com Switch Unit
Cable Packaging
Front
Panel Side
of Unit
Back
Panel Side
of Unit