APC 300 Battery Charger User Manual


 
MGE™ Galaxy™ 300 10-40 kVA 3:3, 10-30 kVA 3:1 - 380/400/415 V Installation8
Connect the Battery Cables between the UPS and
Battery Enclosure
Warning: This procedure describes how to connect the initial battery cables between
the UPS and XR before start-up. If the UPS is up running, see “Connect an XR Battery
Enclosure to a running UPS” on page 10.
BAT+, BAT-, and N
1. Run the ground cable up
through the bottom front hole of
the XR and connect it to the
busbar.
2. Run the BAT+, N, and BAT-
cables up through the bottom
front hole.
3. Attach the cables to the right
side of the battery breaker.
4. Reinstall the side panels.
+
N
-
+
N
-
Front view
Cables to/from the UPS
Battery
enclosure