This section describes the daily, weekly, monthly and semi-
annual maintenance schedules that should be performed when
changing materials or lines, or when changing equipment, as
well as the maintenance procedures to follow.
Cutting either flexible or rigid materials generates tremendous
shock and vibration to the entire unit. Anything that can
loosen, will over time.
To maintain the best performance, follow this maintenance
schedule and develop an effective preventative maintenance
program.
●
Daily
❒❒
Checking saw blade(s)
Clean, sharpen or replace as needed (see Section 4,
Blade Replacement.)
❒❒
Inspecting the blade mounting hardware
The blade securing bolt should use both a lock washer
and flat washer, and be tightened enough to fully com-
press the lock washer. Replace the holding pins if they
appear worn.
❒❒
Inspecting the the saw product guides for wear and
alignment.
❒❒
Inspecting saw alignment
Proper saw alignment is critical for optimum perfor-
mance. Use a plumb line or laser to check for a
straight line from the extrusion die to the saw bush-
ings.
❒❒
Check floor locks
It is always recommended that the weight be removed
from the casters for optimum stability during cutting
cycles. Check to see if the floor locking mechanism is
properly adjusted.
CTS Saw UGE058/0803
5-4 MAINTENANCE
MAINTENANCE
OVERVIEW
PREVENTATIVE
M
AINTENANCE
SCHEDULE