8-English
12
13
20
14
15
16
17
18
Fig. 1E
19
21
12. Caster (4)
13. Intake cap and ring (4)
14. Knob for attaching legs to blower/motor assembly (6)
15. 3/8” (9.5mm) Flat washer for knobs (6)
16. 5/16” (9mm) Small flat washers for casters (16)
17. M4 Sheet metal screw for dust intake port (4)
18. 5/16”x3/4” Hex head screw for attaching casters to base (16)
19. 5/16” (8mm) Lock Nut (2)
20. 5/16” (8mm) x 1
1
/2” Hex head screw for bag hanger assembly (2)
21. 5/16” (8mm) Large washers for bag hanger assembly (4)
ASSEMBLY
UNPACKING AND CLEANING
Carefully unpack the machine and all loose items from the shipping container(s). Remove the rust-preventative oil from
unpainted surfaces using a soft cloth moistened with mineral spirits, paint thinner or denatured alcohol.
Do not use highly volatile solvents such as gasoline, naphtha, acetone or lacquer thinner for cleaning your
machine.
After cleaning, cover the unpainted surfaces with a good quality household floor paste wax.
ASSEMBLY TOOLS REQUIRED
Phillips head screwdriver
12 mm wrench
ASSEMBLY TIME ESTIMATE
Assembly for this machine takes approximately 1-2 hours.