FujiFilm QP242 Welding System User Manual


 
46
ProLINE-RoadRunner Operator’s Guide A
Run the Self-Test procedure
approximately once a week.
To run the Self-Test procedure:
1. Press Pause.
2. Clear all devices from the
sockets and from the conveyor
belt.
3. Toggle the power switch off and
then back on.
The Self-Test will run, checking
the condition of the
components.
4. Check the display for system
errors.
Running the Self-Test
1
>Job
Advance Pocket
Align Pocket
3