Start-Up
Color Change Procedure
1. 7XUQ$LU&RQWURO9DOYHFORFNZLVHWR³&2/25
CHANGE” position.
2. Turn Material Valve, P/N 21192-00, from Material
Hose to Recirculating Hose (handle in vertical
position). This will relieve pressure on Material Hose.
3XPSZLOOF\FOHWRGRZQVWURNHDQGVWRS
Once the pumps are in the down position, close
material valve.
3. Turn Main Air Supply Valve to the “off” position.
This will relieve the air pressure on the Air Motor.
valve
valve
Drive arm
5. 7XUQ0DWHULDO9DOYHDWJXQFORFNZLVHWR³2))´
position. Material valve should remain in “OFF”
position until color Material Hose is required again.
6. 'HWDFK4XLFN'LVFRQQHFW)LWWLQJ*XQHQG
31IURP4XLFN'LVFRQQHFW)LWWLQJ+RVH
end),P/N 20261-00.
cut
out
O-RING
4. 3XOODQGURWDWH3LYRWNQRE
to disengage the catalyst drive
arm.
CJ-154 O-RING
16 GC-1392Z