IDEAL INDUSTRIES 61-095 Power Hammer User Manual


 
Page 8
Performance Tests
The following performance tests verify the complete operability of the meter and check the accuracy of each
meter function against the meter’s specifications.
Accuracy specifications are valid for a period of one year after calibration, when measured at an operating
temperature of 18ºC to 28ºC and at a maximum of 80% relative humidity.
To perform the following tests, it is not necessary to open the case; no adjustments are necessary. Merely
make the required connections, apply the designated inputs, and determine if the reading on the meter display
falls within the acceptable range indicated.
If the meter fails any of these tests, it needs calibration adjustment or repair.
Testing the Voltage Function
To verify accuracy in the AC voltage ranges, do the following:
1. Connect the calibrator to the V and COM inputs on the meter.
2. Set the calibrator for the voltage and frequency from step 1 to 6 in Table 1.
3. Compare the reading on the meter display with the display reading shown in Table 1.
4. If the display reading falls outside of the range shown in Table 1, the meter does not meet specification.
Table 1 AC Voltage Test:
Step Input Frequency Reading
1 3V 50Hz 0 to 6
2 3V 500Hz 0 to 6
3 100V 50Hz 95 to 105
4 100V 500Hz 95 to 105
5 600V 50Hz 588 to 612
6 600V 500Hz 588 to 612
5. Turn the rotary switch to “V
” position.
6. Set the calibration for the voltage from step 1 to 3 in Table 2.
7. Compare the reading on the meter display with the display reading shown in Table 2.
8. If the display reading falls outside of the range shown in Table 2, the meter does not meet specification.
Table 2 DC Voltage Test:
Step Input Reading
1 3V 1 to 5
2 100V 97 to 103
3 600V 592 to 608
Form number TM61095 Rev 2 September 2002