OM-4423 Page 17
5-2. Mounting Welding Generator
Tools Needed:
9/16 in
2
2
3
4
Welding Unit In Place
Bolting Unit In Place
Y Do not weld on base. Weld-
ing on base can cause fuel
tank fire or explosion. Weld
only on the four mounting
brackets or bolt unit down.
Y Do not mount unit by sup-
porting the base only at the
four mounting brackets.
Use cross-supports to ade-
quately support unit and pre-
vent damage to base.
Mounting Surface:
1 Cross-Supports
2 Mounting Brackets (Supplied)
Mount unit on flat surface or use
cross-supports to support base.
Secure unit with mounting brack-
ets.
3 1/2 in Bolt And Washer
(Minimum − Not Supplied)
4 3/8-16 x 1 in Screws
(Supplied)
To Bolt Unit In Place:
Remove hardware securing the
four mounting brackets to the base.
Reverse brackets and reattach to
base with original hardware.
Mount unit to truck or trailer with 1/2
in (12 mm) or larger hardware (not
supplied).
To Weld Unit In Place:
Weld unit to truck or trailer only at
the four mounting brackets.
1
Inadequate support.
2
Supporting The Unit
Using Mounting Brackets
Y Do not use flexible mounts.
1
OR
install3 6/05 803 274 / 200 864-A / 803 562