Miller Electric XMT 4-Rack Welder User Manual


 
OM-815 Page 6
SECTION 4 INSTALLATION
4-1. Selecting A Location And Moving Rack
WARNING
ELECTRIC SHOCK can kill.
Do not touch live electrical parts.
Disconnect input power conductors from de-
energized supply line BEFORE moving rack.
FIRE OR EXPLOSION can result from
placing unit on, over, or near com-
bustible surfaces.
Do not locate unit on, over, or near combustible
surfaces.
Do not install unit near flammables.
FUMES can be hazardous; LACK OF
FRESH AIR AND PROPER VEN-
TILATION can be harmful.
Do not breathe welding fumes.
Place unit only where there is a good fresh air supply
and proper ventilation.
FALLING EQUIPMENT can cause
serious personal injury and equipment
damage.
Move unit with crane or fork lift vehicle of adequate
capacity.
swarn11.1* 3/93
ST-158 366
1 Lifting Eye
Use lifting eye to move unit.
2 Lifting Forks
If using lifting forks, be sure forks
are fully inserted.
1
2
Figure 4-1. Location And Movement Of Rack
4-2. Installing Welding Power Source Onto Rack
1 Bracket
Remove user-supplied bolt or lock
if applicable.
2 Securing Bolts
Loosen.
3 Front Bracket
Swing end near rack center away
from rack.
4 Rear Bracket
5 Securing Bracket
Place welding power source on
rack so rear is against rear bracket
and securing bracket is centered
between welding power source
feet.
Swing front bracket back into
position.
Tighten securing bolts.
Reinstall user-supplied bolt or lock
if applicable.
6 Weld Cable Hanger
ST-158 332 / S-0548 / ST-151 268-A
6
1
3
2
4
5
As Shipped
In Use
Figure 4-2. Welding Power Source Installation