Patton electronic SN5200 Saw User Manual


 
Planning the Installation 22
SmartNode 5200 User Manual 3 • SmartNode Installation
Planning the Installation
Before installing the gateway router device, the following tasks should be completed:
Create a network diagram (see section “Network Information” on page 22)
Gather IP related information (see section “IP Related Information” on page 23 for more information)
Install the hardware and software needed to configure the SmartNode. (See section “Software Tools” on
page 23)
Verify power source reliability (see section “Power Source” on page 23).
After you have finished preparing for gateway router installation, go to section “Installing the Gateway Router”
on page 23 to install the device.
Site Log
Patton recommends that you maintain a site log to record all actions relevant to the system, if you do not
already keep such a log. Site log entries should include information such as listed in Table 4.
Network Information
Network connection considerations that you should take into account for planning are provided for several
types of network interfaces are described in the following sections.
Network Diagram
Draw a network overview diagram that displays all neighboring IP nodes, connected elements and
telephony components.
The mains outlet that is utilized to power the equipment must be
within 10 feet (3 meters) of the device and shall be easily acces-
sible.
Table 4. Sample site log entries
Entry Description
Installation Make a copy of the installation checklist and insert it into the site log
Upgrades and mainte-
nance
Use the site log to record ongoing maintenance and expansion history
Configuration changes Record all changes and the reasons for them
Maintenance Schedules, requirements, and procedures performed
Comments Notes, and problems
Software Changes and updates to SmartWare software