Porter-Cable 4114 Saw User Manual


 
6
1
/2" HALF-BLIND DOVETAILS
PREPARING ROUTER
1. DISCONNECT ROUTER FROM POWER SOURCE.
2. Insert templet guide, (A) Fig. 4, in hole (B), in router sub-base (C).
3. Install templet guide locknut (D) on templet guide and firmly tighten to lock templet guide in sub-base.
4. Insert dovetail bit, (A) Fig. 5, through templet guide into router collet.
5. Adjust router so dovetail bit projection (B) from bottom of router sub-base (C), is
9
/16".
CLAMPING DRAWER PARTS
1. Temporarily clamp the left side of the drawer “inside out” under front clamp bar and extending approximately
1
/4"
above top surface of the base as shown in Fig. 6.
The following are required to produce
1
/2" half-blind dovetails.
#1 Edge Guide (furnished with Model 4112)
4113
1
/2" Half-Blind Dovetail Templet (furnished with Model 4112)
42046
5
/8" Templet Guide (furnished with Model 4112)
Available 42237 Locknut (furnished with Model 4112)
as
Accessories
43705 Carbide Tipped,
1
/2" Dovetail Bit (
1
/4" Shank)
or
43750 Carbide Tipped,
1
/2" Dovetail Bit (
1
/2" Shank)
Fig. 3
Fig. 4
Fig. 5
Fig. 6 Fig. 7