CONNECTING TO THE GRID (AC UTILITY)
1. Measure grid (utility) voltage and frequency. It should be 230VAC
or 220VAC), 50/60Hz, and single phase.
2. Switch off by breaker or fuse between PV-Inverter and utility.
3. For Protect PV 2000 and 800, connect AC wires as follows:
• Disassemble female socket.
• Connect AC wires to connection socket as indicated.