Cisco Systems 2691 Saw User Manual


 
12
Installing on Desktop
Caution If you place the Cisco router on a desktop, do not place anything that weighs more than 10 pounds (4.5 kilograms)
on top of the chassis.
Grounding the Chassis
You must connect the chassis to a reliable earth ground; the ground wire must be installed in accordance with local electrical
safety standards.
For NEBS-compliant grounding, use size AWG 6 (13 mm
2
) wire and the ground lug provided in the accessory kit.
For NEC-compliant grounding, use size AWG 14 (2 mm
2
) or larger wire and an appropriate user-supplied ring terminal.
For EN/IEC 60950-compliant grounding, use size AWG 18 (1 mm
2
) or larger wire and an appropriate user-supplied ring
terminal.
To connect the chassis to a reliable earth ground, perform the following steps:
Step 1 Strip one end of the ground wire to the length required for the ground lug or terminal.
For the NEBS ground lug—approximately 0.75 in. (20 mm)
For user-provided ring terminal—as required
Step 2 Crimp the ground wire to the ground lug or ring terminal, using a crimp tool of the appropriate size.
Step 3 Attach the ground lug or ring terminal to the chassis as shown in Figure 6 or Figure 7. For the ground lug, use the two
screws with captive locking washers provided. For a ring terminal, use one of the screws provided. Use a number 2
Phillips screwdriver, and tighten the screws to a torque of 8 to 10 in-lb (0.9 to 1.1 N-m).
Step 4 Connect the other end of the ground wire to a grounding point at your site.
Figure 6 NEBS-Compliant Chassis Ground Connection Using Ground Lug
Figure 7 Chassis Ground Connection Using Ring Terminal
Ground lug
attachment
72228
EN
ASYNC
ASYNC 8-15
ASYNC 0-7
1
5
1
4
1
3
1
2
1
1
1
0
9
8
7
6
5
4
3
2
1
0
ASYNC 24-31
ASYNC 16-23
3
1
3
0
2
9
2
8
2
7
2
6
2
5
2
4
2
3
2
2
2
1
2
0
1
9
1
8
1
7
1
6
S
E
E
M
A
N
U
A
L
B
E
F
O
R
E
IN
S
T
A
L
L
A
T
IO
N
C
O
N
S
O
L
E
A
U
X
F
A
S
T
E
T
H
E
R
N
E
T
0
/
1
F
A
S
T
E
T
H
E
R
N
E
T
0
/
0
AL
CD
LP
RD
TD
S
E
E
M
A
N
U
A
L
B
E
F
O
R
E
IN
S
T
A
L
L
A
T
IO
N
D
S
U
5
6
K
AL
CD
LP
RD
TD
S
E
E
M
A
N
U
A
L
B
E
F
O
R
E
IN
S
T
A
L
L
A
T
IO
N
D
S
U
5
6
K
ACT
100 Mbps
LINK
ACT
100 Mbps
LINK
CF1
CISCO2691
Ring terminal
attachment
103008
EN
A
S
Y
N
C
ASY
NC
8-15
ASYN
C 0-7
1
5
1
4
1
3
1
2
1
1
1
0
9
8
7
6
5
4
3
2
1
0
ASYN
C 24-31
ASYN
C 16
-23
3
1
3
0
2
9
2
8
2
7
2
6
2
5
2
4
2
3
2
2
2
1
2
0
1
9
1
8
1
7
1
6
S
E
E
M
A
N
U
A
L
B
E
F
O
R
E
IN
S
T
A
L
L
A
T
IO
N
C
O
N
S
O
L
E
A
U
X
F
A
S
T
E
T
H
E
R
N
E
T
0
/1
F
A
S
T
E
T
H
E
R
N
E
T
0
/
0
AL
CD
LP
RD
TD
S
E
E
M
A
N
U
A
L
B
E
F
O
R
E
IN
S
T
A
L
L
A
T
IO
N
D
S
U
5
6
K
AL
CD
LP
RD
TD
S
E
E
M
A
N
U
A
L
B
E
F
O
R
E
IN
S
T
A
L
L
A
T
IO
N
D
S
U
5
6
K
A
C
T
100 M
b
ps
LIN
K
A
C
T
100 M
b
ps
LIN
K
C
F1
CISCO2691