Dell E11J Tool Storage User Manual


 
Before You Begin
Consider the following best practices before setting up your SC180 expansion enclosure.
Before connecting any cables between the storage system and expansion enclosure, physically label
each port and connector.
Always follow proper power-up and power-down procedures when cycling power across the
network. Verify that critical network components are on separate power circuits.
NOTE: This product is intended for restricted access locations, such as a dedicated equipment
room or equipment closet.
WARNING: If installed in a closed or multi-unit rack assembly, the operating ambient
temperature of the rack environment may be greater than room ambient temperature. Therefore,
consideration should be given to installing the equipment in an environment compatible with the
maximum ambient temperature (Tma) specified by the manufacturer.
Safety Warnings
A fully configured SC180 expansion enclosure weighs up to 130 kg
(287 lb). An unpopulated expansion enclosure weighs 62 kg (137 lb).
Use appropriate lifting methods when installing the expansion
enclosure.
The operating temperature inside the drawers of a expansion
enclosure can reach up to 60°C (140°F). Take care when opening
drawers and removing disk carriers.
Disconnect all electrical supply connections to the expansion
enclosure before proceeding.
Other Information You May Need
Additional information you may need to install the expansion enclosure.
NOTE: See the safety and regulatory information that shipped with your Storage Center
components. Warranty information is included as a separate document.
The Dell Storage Center SCv2080 Storage System Deployment Guide provides information about
cabling Storage Center hardware components and configuring a new Storage Center using the Dell
Storage Client.
The Dell Storage Center Dell Storage Client Administrator’s Guide describes how to use the Dell
Storage Client to manage a Storage Center.
3