- 1 -
11101
D
U
K
A
N
E
A
A
p
p
p
p
l
l
i
i
c
c
a
a
t
t
i
i
o
o
n
n
N
N
o
o
t
t
e
e
AN200
Rev 01
© Dukane Corporation 2003. All rights reserved.
Dukane Corporation
2900 Dukane Drive Saint Charles, IL 60174 USA
Phone (630) 797-4900 FAX (630) 797-4949
http://www.dukane.com/us
Intelligent Assembly Solutions
1
Automation Interface Requirements for the System Input Interface
of a DPC II / II+ Welding System
The DPC II / II+ welding system offers several features that are intended to communicate with automation. These features
allow the automation to control events that occur during the welding process. This document will provide guidelines that
will help you interface automation to a DPC welding system per Dukane Corporation’s requirements. Information within
this document is intended to supplement the information in the DPC II (Dukane part # 403-558) and DPC II+ (Dukane part
# 403-551)manuals.
Application Note Topics:
• The System In Connector Pin assignments
• The 200-1203 Basic Interface Cable
• System Input Signal Descriptions
• System Input Interface Examples