Although not required, we recommend that you
mount your new machine to the floor. Because
this is an optional step and floor materials may
vary, floor mounting hardware is not included.
Generally, you can either bolt your machine to
the floor or mount it on machine mounts. Both
options are described below. Whichever option
you choose, it is necessary to level your machine
with a precision level.
Bolting to Concrete Floors
Lag shield anchors with lag bolts (Figure 7) and
anchor studs (Figure
8) are two popular meth-
ods for anchoring an object to a concrete floor.
We suggest you research the many options and
methods for mounting your machine and choose
the best that fits your specific application.
Mounting to Shop
Floor
Figure 7. Typical lag shield anchor and lag bolt.
Figure 8. Typical anchor stud.
NOTICE
Anchor studs are stronger and more per-
manent alternatives to lag shield anchors;
however, they will stick out of the floor,
which may cause a tripping hazard if you
decide to move your machine
.
Figure 9. Machine mount example.
Using Machine Mounts
Using machine mounts, shown in Figure 9, gives
the advantage of fast leveling and vibration reduc
-
tion. The large size of the foot pads distributes
the weight of the machine to reduce strain on
the floor. Machine mounts for this machine use