-16-
Model G0765 (Mfd. Since 12/13)
SECTION 3: SETUP
Your machine was carefully packaged for safe
transportation. Remove the packaging materials
from around your machine and inspect it. If you
discover any damage, please call us immediately
at (570) 546-9663
for advice.
Save the containers and all packing materials for
possible inspection by the carrier or its agent.
Otherwise, filing a freight claim can be difficult.
When you are completely satisfied with the condi
-
tion of your shipment, inventory the contents.
Unpacking
The list below outlines the basic process of pre-
paring your machine for operation. Specific steps
are covered later in this section.
The typical preparation process is as follows:
1. Unpack lathe and inventory contents of box/
crate.
2. Clean lathe and its components.
3. Identify an acceptable location for lathe and
move it to that location.
4. Assemble loose components and make any
necessary adjustments or inspections to
ensure lathe is ready for operation.
5. Connect lathe to power source.
6. Test run lathe to ensure it functions properly.
7. Perform spindle break-in procedure to pre-
pare lathe for operation.
Preparation
SUFFOCATION HAZARD!
Keep children and pets away
from plastic bags or packing
materials shipped with this
machine. Discard immediately.
The following are needed to complete the setup
process, but are not included with your machine.
Description Qty
• Additional People ....................................... 1
• Safety Glasses ...............1 For Each Person
• Cleaner/Degreaser (Page 18) .... As Needed
• Quality Metal Protectant ............. As Needed
• Disposable Shop Rags ............... As Needed
Needed for Setup