10
English
ASSEMBLY AND OPERATION
APPLICATIONS
Rotation and hammering function
⅜ Drilling anchor holes
⅜ Drilling holes in concrete
Hammering function only
⅜ Crushing concrete, chipping, digging, and squaring
(by applying optional accessories)
PRIOR TO OPERATION
1. Power source
Ensure that the power source to be utilized conforms to the power source
requirements specified on the product nameplate.
2. Power switch
Ensure that the switch is in the OFF position. If the plug is connected to a
receptacle while the switch is in the ON position, the power tool will start operating
immediately and can cause serious injury.
3. Extension cord
When the work area is far away from the power source, use an extension cord of
sufficient thickness and rated capacity (refer to page 9). The extension cord should
be kept as short as practicable.
WARNING: Damaged cord must be replaced or repaired.
4. Check the receptacle
If the receptacle only loosely accepts the plug, the receptacle must be repaired.
Contact a licensed electrician to make appropriate repairs.
If such a fautly receptacle is used, it may cause overheating, resulting in a serious
hazard.
5. Confirming condition of the environment:
Confirm that the work site is placed under appropriate conditions conforming to
prescribed precautions.
6. How to install tool
CAUTION: For tools such as a drill bit and a bull point, use only Hitachi genuine
parts.
(1) Clean, then smear the tool shank with the grease provided in the green tube.