Husqvarna RG 2112 Planer User Manual


 
23
PRE-OPERATION CHECKLIST
Before starting the machine, make sure that you read this entire Operations Manual and are
familiar with the operation of the machine.
ALWAYS place the machine on a level surface with the engine/motor “OFF”, the ignition switch
set in the “OFF” position and disconnected from the power source before performing any
maintenance. Let the machine cool down!!
Before performing any maintenance, ALWAYS place the machine on a level surface with the
engine/motor “OFF”, the ignition switch set in the “OFF” position and disconnected from the
power source!
Before leaving our factory, every machine is thoroughly tested. Follow our instructions
strictly and your machine will give you long service in normal operating conditions.
WITH MACHINE COLD AND SETTING LEVEL:
Gasoline Models: Check engine oil. Fill to the full mark on dipstick with 10W30 oil, class MS, SD,
SE or better.
Electric Models: Verify that all electrical connections are intact.
1-2 HOUR OPERATION CHECK LIST:
1. Check the engine air cleaner hose clamps. Tighten as required.
2. Tension the drive V-belts. DO NOT over tension!
SCHEDULED MAINTENANCE QUICK REFERENCE
SERVICE DAILY:
1. Check engine oil level.
2. Check all guards for damage.
3. Check hoses and clamps for damage or looseness.
Tighten or replace as necessary.
4. Check air cleaner. Clean or replace as required.
5. Clean the machine at the end of the day.
SERVICE EVERY 50 HOURS:
1. Replace engine oil and oil filter.
2. Clean engine air fins.
3. Check V-belt tension. DO NOT over tension!
4. Clean Engine fuel bowl.