INSTALLATION
RECEIVING & UNPACKING EQUIPMENT
1. Check packing slip to ensure ALL material has
been delivered.
2. All material shortages are to be reported to
Liebert within 48 hours from receipt of goods.
Liebert assumes no responsibility for any
material shortages beyond this period.
3. Inspect shipping boxes for damage and note
on shipping waybill accordingly.
4. After unpacking, inspect equipment for
damage and if damage is found, notify the
shipper promptly.
5. All Liebert products are shipped on an F.O.B.
factory basis. Any and all damage, breakage
or loss claims are to be made directly to the
shipping company.
PRE-INSTALLATION CHECKPOINT
1. Ensure that available voltage and phase
corresponds with humidifier voltage and phase
as indicated on humidifier’s nameplate label
(see Figure #1).
2. Ensure that the dedicated external disconnect
is of sufficient size to handle the rated amps
as indicated on the nameplate label. Refer to
local codes.
3. Report any discrepancy immediately.
BASIC HUMIDIFIER CONFIGURATION
Liebert humidifier model SGH has a right side
electrical compartment. Each electrical compartment
has a hinge-down front door which is removable from
any partially or fully opened position. Each electrical
compartment has a screw-mounted right side cover
which can also be removed for ease of electrical
connection. For safety, the door when closed keeps
the side cover from being removed.
Single units have a plumbing compartment
attached to the left side of the electrical. Double units
have a second plumbing compartment. Each
plumbing compartment has a hinge-down front door
which is not intended to be removed. For safety, the
door must be closed in order to engage the lock. To
avoid any danger, never operate the humidifier with a
door off. For safety, each door when closed engages
its own safety interlock switch. All switches must be
engaged before the unit will operate.
To open the doors, unlock key, lift door up slightly
and pull top of door forward. Door will hinge 180
degrees and hang straight down. To remove door,
swing door parallel to floor. Then lift up slightly and
out. To reinstall door, hold parallel to floor and insert
hinge pins at bottom. The door can then be closed.
LOCATION & MOUNTING
HUMIDIFIERS
SGH humidifiers are designed to mount on a
suitable wall or vertical surface. Do not sit on floor due
-1-
Power And
Control
Wiring
Condensate
Return
Steam
Outlet
Drain
Water
Su
pp
l
y
Nameplate
Label
Figure #1
SGH Series Humidifier
TOP VIEW
WALL
WITHOUT BLOWER PACK
MIN.36"SIDE
CLEARANCE
RECOMMENDED.
SEENOTE.
NOTE: LOCALAND NATIONAL
CODES MAYDEVIATE. PLEASE
CONSULTAPPLICABLE CODES
FOR CLEARANCE REQUIREMENTS
INALL CASES.
MIN. 36"
FRONTAL
CLEARANCE.
Figure #2
Clearance Requirements