A SERVICE OF

logo

7
Required For This Page:
(4)
(2)
(1)
RG
RK
RI
HH01900B
RJ
RI
RG
14
Only hand tighten the
Nuts (RG) now.
Tightening these Nuts later will
adjust the Rim tension.
1/2 Wrenches
Only hand tighten
the Nuts (RG).
Tighten the Jam Nuts (RK) onto
the U-Bolt as far as they will go.
RG
RK
15
HM
HM
Bend the Backboard Brackets (LB & RB) out.
LB
RB
Completely tighten all Rim hardware.
(not
actual
size)
HM
HH01700C
(2)
Use a 3/8 wrench to attach the Screws (HM) through the top holes in
the Backboard Brackets and into the Backboard.
3/8 Wrench
13
Lay the Backboard on a
bench or table.
The U-Bolt (RF) goes through the
top holes in the Backboard. The Rim
Support Bracket (AF) lines up with
the lower holes in the Backboard
Brackets and Backboard.
AF