Chapter 8
Installing B68 Cabinets
3Com Corporation
8-24
Each cabinet is equipped with four sets of brackets for fixing floor pallets, two for each rail.
Figure 8-27 shows a T-shape nut.
Figure 8-27 T-shape nut
II. Leveling and fixing rails
Fix the rails on the rack with T-shape nuts, flat washers, spring washers and bolts M12×20
as shown in
Figure 8-28.
Caution:
Install rails in such a way that their protective sides are outward as shown in Figure
8-28.
Follow these steps to level and fix the rails:
1) First screw the bolts M12×20 with spring washers and flat washers. Do not
tighten the screws at this time, just make sure they will not drop down.
2) Insert the bolts into the rack holes in sequence.
3) Measure (in both transverse and longitudinal directions) the slide rail segments
with a horizontal ruler to check that the bubble in the horizontal ruler is in the
middle. If the slide rail is horizontal, tighten the bolts in sequence and measure
horizontality again. If not, adjust by adding or reducing washers. See
Figure
8-29.
4) The installed slide rails must meet these requirements:
z Individual slide rail segments must be horizontal in longitudinal direction.
z Two parallel slide rails must be horizontal in transverse direction.
z The distance between the central lines of two parallel slide rails should be
720mm!1mm.
When joining multiple slide rail segments, adjust them using a straight thread, making sure that
they form a straight line. No gap or height difference is allowed between the joints.