AEG TKS-CS Saw User Manual


 
Compact Station TKS-CS - Operating Instructions
Page 20 of 39 8000043213 BAL
2. Establish the AC power connections and PE connections using
the cable lug in accordance with the circuit diagram, and using
the relevant tightening torque.
3. Remove any cable debris and tools from the equipment and
replace the protective cover on the connection panel.
7.2.2 ISO Small Distribution Box
5
1 6
7
2 8
3
4 5
Figure 14 - ISO small distribution box (example)
1 Residual-current-operated circuit-
breaker
2 Back-up fuse sub-distribution
3 Terminal strips
4 Motor protection switch
Auxiliary transformer
5 Screw connections
6 Miniature circuit breakers
7 Fuses, max. 25 A
8 Overvoltage protection
The ISO small distribution box is preinstalled in the compact
station.
To open the ISO small distribution box, unscrew the four screw
connections. The cover can then be pulled out towards the front.
Establish the connections in accordance with the circuit diagram.
7.2.3 Communication Interface PV.LoG-MH
The communications cabinet PV.LoG-MH includes batteries, which
are installed in the cabinet or in a separate box.
Install the communications cabinet PV.LoG-MH in accordance with
the PV.LoG installation instructions. Wiring is carried out in
accordance with the circuit diagram.
Data is exchanged between the PV.IcX combiner boxes or the
PV.ControL and the PV.LoG-MH via CAN bus ( *.USP and
operating instructions for PV.LoG and PV.ControL).