Compact Station TKS-CS - Operating Instructions
8000043213 BAL Page 21 of 39
7.2.4 Central Earthing System
Connect the active earthing to the potential equalising strip
according to the circuit diagram.
7.2.5 Medium-Voltage System
1 2
Figure 15 - Medium-voltage system (example)
1 Cable branch line L1/L2/L3 (left flap), external AC connections
2 Transformer branch line (right flap),
internal AC connections from transformer to load interrupter switch
The MV system is preinstalled in the compact station.
Use the power cables supplied for the system AC connections,
and connect in accordance with the manufacturer's installation
instructions located in the system. Insert the branch cable into the
compact station from below.