AEG TKS-CS Saw User Manual


 
Compact Station TKS-CS - Operating Instructions
8000043213 BAL Page 35 of 39
Annually
Measuring and monitoring devices must comply with the VDE 0413
standard.
Check and calibrate all measuring instruments.
Check that the equipment as a whole is in perfect working order:
- Check housing and roof structure for damage
- Check line connections for dirt and corrosion
- Check protective covers for damage and check their
fastenings
Check all input, monitoring and output values in the equipment and
also in interaction with the external control system. Check the control
behaviour of the equipment and readjust, correct or change the limit
values if required.
Check the function of the peripheral connections, i.e. all connections of
the various accessory systems, and repair them if required.
Clean the equipment to minimise creepage currents (do not use water).
Comply with BGV A3, DIN VDE 0105-100 during this process.
Check that the safety signs are complete and legible, and replace if
required.
(Must be checked by an expert every 2 years.)
Check the function of the lighting in the compact station, and replace if
necessary.
Every 2 years
Check of the safety signs in the operating area and in the equipment
by an expert.
Every 4 years
Replace the axial ventilator and clean the weather-proof cover.
10.5 Storing Spare Parts
i
When ordering spare parts, you must provide the component
designation, installation location and component number as
well as the unit number of the component.
The AEG PS customer service department will be happy to send
you a spare parts list on request.