Compact Station TKS-CS - Operating Instructions
Page 24 of 39 8000043213 BAL
8 Start-up
DANGER
Working with voltages up to 1 kV
Risk to life due to electric shock.
Comply with BGV A3, DIN VDE 0105-100 (EN 50110,
IEC 61243).
Skilled personnel with a Working with Live Current
certificate.
Special AEG Power Solutions software and hardware tools must
be used for initial start-up. Only skilled personnel trained by
AEG PS are in a position to use these tools correctly and to
perform initial start-up.
Once the equipment has been fully installed, the following aspects
must be checked:
• Screw connections properly tightened
• Cable connections properly established
• Tools removed
• Protective covers properly installed
9 Operation
The system is operated as a result of power emerging from the Protect PV
inverter; this is determined by the power plant control system.