Compact Station TKS-CS - Operating Instructions
Page 34 of 39 8000043213 BAL
10.4 Maintenance Schedule
The maintenance schedule does not release the owner from his
obligation to create his own maintenance and operating
instructions for the location and to document them fully as quickly
as possible.
Maintenance instructions supplied by component manufacturers
must be included in the detailed specifications relating to the scope
of maintenance work.
i
For recurrent measurements and measurements after repair
work as per BGV A3, compliance with the DIN VDE 0105-100
inspection intervals is mandatory.
Ongoing
Check the measured results of the equipment for plausibility.
Replace defective measuring instrumentation at the end of production.
Data bus:
Ongoing functional testing in operation.
Monthly
Test lamps and replace diodes if required.
Check the function of the system's internal measuring instrumentation
by comparing the values during operation with the values displayed.
Check the function of the measuring instruments and accessory
systems required for operation and servicing.
Check the interior area and equipment for moisture and, if necessary,
establish the cause and dry the equipment.
Clean the interior areas of the compact station (operating area).
Every 6 months
Check the fastenings and function of the electrical connections of all
components in the compact station.
Check the function of the fault current, differential current and fault
voltage protective circuits.
Carry out recurrent measurements in accordance with DIN VDE 0105.
Check the axial ventilator for damage and whether it is working
correctly (rotation), and repair or replace if necessary.
Check the axial ventilator and weather-proof cover for dirt, and clean if
necessary.
Check the function of the overtemperature warning system by opening
the sensor path.