Cisco Systems 2654T6 Router User Manual


 
REVIEW DRAFT—CISCO CONFIDENTIAL
A-17
Cisco XR 12416 Router Chassis Installation Guide
OL-xxxxx-xx
Appendix A Repackaging the Router
Repackaging the Routers
To reinstall the router and scissor-jack platform on the shipping pallet, use
Figure A-7 as a reference and follow these steps:
Step 1 Use the hand truck to move the chassis to a level, open space with a solid floor.
Step 2 Tilt the chassis upright so that it stands on the scissor-jack platform, then remove
the hand truck.
Step 3 Use the bolts from the original shipping package to attach the eight hold-down
brackets to the sides of the scissor-jack platform (two brackets on each side).
Note The hold-down brackets are not symmetrical: The bracket plate that
fastens to the side of the scissor-jack platform is narrower than the bracket
plate that fastens to the top of the pallet, and has smaller diameter bolt
holes.
Step 4 Position the U-shaped pallet body behind the scissor-jack platform with the
opening facing the back panel of the router.
Step 5 Use the 3/4-inch (19-mm) socket and ratchet wrench to turn the scissor-jack screw
slowly counterclockwise to expand the scissor-jack platform and raise the top of
the scissor-jack platform high enough for the hold-down brackets to clear the top
of the pallet body.
Step 6 Slide the pallet body around the scissor-jack platform.
Step 7 Slide the pallet front bar into the opening on the pallet body and use the hinge
locks to secure it as instructed in these steps:
a. Pivot the butterfly handle on the hinge lock up so that it is perpendicular to
the body of the hinge lock.
b. Twist the butterfly handle counterclockwise to extend the hinge lock hook to
its maximum reach.
c. Lower the hinge lock hook over the hinge lock catch on the pallet body.
d. Twist the butterfly handle clockwise to clamp the hinge lock hook on the
hinge lock catch on the pallet body.
e. Pivot the butterfly lever down onto the hinge lock body so that it lies flat.