Cisco Systems 2654T6 Router User Manual


 
REVIEW DRAFT—CISCO CONFIDENTIAL
Appendix A Repackaging the Router
Repackaging the Routers
A-18
Cisco XR 12416 Router Chassis Installation Guide
OL-xxxxx-xx
Step 8 Shift the pallet to ensure that it is positioned evenly all the way around the
scissor-jack platform and the bolt holes in the hold-down brackets on the sides of
the scissor-jack platform are aligned with the holes in the top of the shipping
pallet.
Step 9 Turn the scissor-jack screw slowly clockwise to close the scissor-jack platform
and lower the top of the scissor-jack platform slowly until the hold-down brackets
touch the top of the shipping pallet.
Step 10 Set a blocking plate into the hold-down bracket so that the blank side of the
blocking plate is against the heads of the bolts in the side of the scissor-jack
platform and the open holes in the blocking plate align with the bolt holes in the
top of the pallet.
Step 11 Insert bolts through each of the hold-down bracket holes and into the holes in the
top of the shipping pallet, then use the 9/16-inch (14-mm) wrench to tighten the
bolts.
Step 12 Turn the scissor-jack screw slowly clockwise to collapse the scissor-jack platform
and raise the base of the scissor-jack platform until the weight of the router and
scissor-jack platform is absorbed by the pallet. Continue turning the scissor-jack
screw clockwise to close the scissor-jack platform and lift the base of the
scissor-jack platform until the scissor-jack platform is completely closed (the
screw can not be turned).